Water Tank Projects

Company: Arrington Watkins Architects LLC
Independent 3rd Party Inspection – ADC 4000 Bed Project Yuma, AZ – Water Tanks (3)
Independent 3rd Party Inspection – ADC – Tucson, AZ – Water Tanks (3)
Independent 3rd Party Inspection – ADC – Perryville, AZ – Water Tanks (2)

Company: Brown Tank and Steel
Independent 3rd Party Inspection – Numerous Water Tanks –
WO200 – 100,000 Gallon Water Tank
WO 203 – 100,000 Gallon Water Tank
W0 277 – 86’ X 26’ Water Tank – Flagstaff AZ
WO 278 – 10’ Inlet Water Pipe – Weber Group
WO290 – Coating System Evaluation – Water Tank s (2) – Stanfield AZ
PO #2393-6522 – 6’dia.x 16’ Pressure Vessel
PO#2474 – 6534A & 6535A – 500 Gal. Hydro- Tanks (3)
65’ X 22’ Water Tank – Freescale – Chandler AZ
65’ X 22’ Water Tank – El Paso Texas
Florence Water Tank – Florence AZ

Company: Currier Construction
Independent 3rd Party Inspection / Consultant/ Coating Specification – 300K Golf Course Water Tank – City of Douglas AZ
Ajo Water Tank – Ajo AZ

Company: Cashion Tank
Independent 3rd Party Inspection – Water Tanks- Cottonwood AZ (2)

Company: City of Chandler, AZ
Independent 3rd Party Inspection – Shawnee WPF –Arsenic Separator Tanks
Independent 3rd Party Inspection – Amber Wood WPF –Arsenic Separator Tanks

Company: Dial Corp
Independent 3rd Party Inspection / Coating System Failure Analysis – Hot Water Tank

Company: Felix Construction
Independent 3rd Party Inspection / Consultant -Terramar Water Tank -1.6 million Gallon – Peoria AZ
Independent 3rd Party Inspection / Consultant –Peoria Sports Complex Water Tank -100 K Gallon – Peoria Sports Complex – Peoria AZ

Company: Garney Construction
Independent 3rd Party Inspection – MCPRD Reservoir & Pressure Tank Renovation
Estrella Mtn. Park: 75K Water Storage Tank & 5K Gallon Water Tank
McDowell Mtn. Park: 100K Water Tank
Adobe Damn Park: New 100K Water Tank, Existing 100K Water Tank & 5K Gallon Water Tank

Company: Tres Rios Engineers
Consultant – Specification Writing – Potable Water Tanks and Steel Pipe Coolidge AZ

Company: Truline Engineers
Independent 3rd Party Inspection – 1.5 Million Gallon Water Tank Safford AZ Water

Company Waterworks Engineering / City of Phoenix, AZ
Independent 3rd Party Inspection – 91st Ave WWTP – Phoenix, AZ JO-066 (Headwork’s Scrubber, Bisulfite Secondary Containment Areas Coating Replacement
JO-068 (Solid Handling Facility Stairs Re-Paint)
JO-82 (Fiberglass Tank Coating Recommendation and Inspection)

Company: Weston Solutions
Independent 3rd Party Inspection/Consultant Mac Dill AFB – Tampa Fl – Fire Water Tank

WWTP,  WTP, Lift Stations, Manholes

Company: A.O. Painting
Independent 3rd Party Inspection – Ocotillo WTP – Steel Hopper – Chandler, AZ

Company: City Of Phoenix
Independent 3rd Party Inspection/Consultant – 23rd Ave WWTP – Phoenix, AZ
Coating Assessment of Chlorine Contact Basin

Company: EEC
Independent 3rd Party Inspection – 11 Mile Corner – Brown Water Tank– Casa Grande, AZ

Company: Entellus
Independent 3rd Party Inspection/Consultant – Camelback Core Booster Pump Station – Scottsdale AZ
Independent 3rd Party Inspection/Consultant – Pipe-Riverside CA
Independent 3rd Party Inspection/Consultant – Surge Tank – TX

Company: Greeley and Hansen
Independent 3rd Party Inspection/Consultant – Kyrene WRF – Tempe AZ
EQ Basin, Membrane Basin #4 Coating System Assessment and Coating Specification Writing
Independent 3rd Party Inspection/Consultant – City of North Las Vegas NV WRF – North Las Vegas NV

Company: Heerup Engineering
Independent 3rd Party Inspection – Avondale WWTP Secondary Containment, Influent/ Effluent Pump Station, Digester Lids
Consultant/Trainer – Course on inspection equipment & proper instrument usage.
Consultant/Specification review and re-write – Surprise Chemical Storage Tank – Surprise WWTP

Company: HDR
Independent 3rd Party Inspection/Consultant – Martin “B – C” Zone Reservoir Liner Replacement – Tucson AZ

Company: SimFlo Pumps & JCH(James Cooke & Hobson Inc)
Independent 3rd Party Inspection – Bowl Assemblies, Joints of 14″ Flanged Column Pipe Discharge Heads – Wilcox, AZ

Company: McCarthy Co Inc
Independent 3rd Party Inspection – Deer Valley WTP Clarifiers and Sulfuric Acid Tank

Company: Phoenix Pipeline/Weitz Co/ DSWA/ David Evans & Assoc
Independent 3rd Party Inspection/ Consultant – Sagewood Lift Station #72 (Secondary Containment, Wet Well, Coating of Pipe, Manholes)

Company: Pierson Construction
Independent 3rd Party Inspection/ Consultant – Lift Station #73 (Secondary Containment) Holiday Testing – Glendale Sports Training Facility Glendale, AZ

Company: Siemens Water Technology Corp
Independent 3rd Party Inspection/Consultant – Coating System Evaluation – Inline Plate Separator – Holland MI
Independent 3rd Party Inspection/Consultant – Coating System Evaluation – Flock Tank – Intel Corp – Chandler, AZ

Company: SimFlo Pumps & JCH
Independent 3rd Party Inspection – Bowl Assemblies, Joints of 14” Flanged Column Pipe Discharge Heads – Wilcox, AZ
Independent 3rd Party Inspection – Steel Pump Heads and Pipes

Company: Southwest Environmental Testing
Independent 3rd Party Inspection – Sanitary Manhole – Shea & Tatum – Phoenix AZ
Independent 3rd Party Inspection – Sanitary Manhole – 40thst & Garfield – Phoenix AZ

Company: Stanley Consultants
Independent 3rd Party Inspection – Calasera @ Desert Ridge Super Block #2 – (Manholes and Junction Boxes)
Independent 3rd Party Inspection/Consultant – Lone Mountain Booster Pump Station – (Pumps and Shade Structure)
Independent 3rd Party Inspection/Consultant – Glendale Sports Training Facility –Manholes and Lift Station #73 (Secondary Containment and Manholes)

Company: Tres Rios Engineers
Consultant – Specification Writing – Secondary Containment – Coolidge AZ

Company: Waterworks Engineering / City of Phoenix, AZ
Independent 3rd Party Inspection – 91st Ave WWTP – Phoenix, AZ JO-066 (Headwork’s Scrubber, Bisulfite Secondary Containment Areas Coating Replacement
JO-068 (Solid Handling Facility Stairs Re-Paint)
JO-82 (Fiberglass Tank Coating Recommendation and Inspection)

Company: Wilson Engineering
Independent 3rd Party Inspection/ Consultant – Chemical Storage Tanks – Deer Valley WTP – Phoenix AZ

Commercial Projects

Company: A Real Deal Painting
Independent 3rd Party Inspection/Consultant – Coating System Failure Analysis –
Pheasant Run Apartments – Chandler AZ

Company: Auto Owners Insurance
Independent 3rd Party Inspection/Consultant – Coating System Failure Analysis – Woods Canyon Lake Store and Marina – Forest Lakes AZ

Company: CCBG Architects
Consultant – Specification Written – Epoxy Floor Systems – Sun City Rec Center – Sun City AZ

Company: Cutler Commercial
Independent 3rd Party Inspection/Consultant – Coating System Failure Analysis – 3 Commercial Buildings Phoenix, AZ

Company: Core Construction
Independent 3rd Party Inspection/Consultant – Coating System Analysis Santa Cruz Administrative and Criminal Justice System Nogales AZ

Company: Coyete Enterprises
Independent 3rd Party Inspection/Consultant – Coating System Failure Analysis – Showroom Floor– Scottsdale, AZ

Company: Denmark Specialty Construction
Independent 3rd Party Inspection/Consultant – Epoxy Floor System – Jacobs Independence Plaza – Surprise, AZ

Company: Lacina Contracting and Painting
Independent 3rd Party Inspection / Consultant / QA/QC – ASU Walter Cronkite School of Journalism – Phoenix AZ
Independent 3rd Party Inspection / Consultant / QA/QC – Max @ Kierland – Scottsdale, AZ

Company NV & SONS Painting
Independent 3rd Party Inspection/Consultant – PH Testing – CMU Block – San Carlos HS – San Carlos, AZ

Company Performance Contracting Inc.
Independent 3rd Party Inspection/Consultant – Testing – Walking Stick Casino – Scottsdale, AZ

Company Pennington Inc
Independent 3rd Party Inspection/Consultant – Coating System Failure Analysis – Kierland Commons – Scottsdale, AZ

Company: Primo Valley Painting
Independent 3rd Party Inspection/Consultant – Coating System Failure Analysis – Dobson Plaza, Mesa, AZ

Company: Tri City Management
Independent 3rd Party Inspection/ QA/QC – Re-Paint – Alamos Condominiums – Scottsdale, Arizona

Company: Tnemec Co Inc
Inspection/ QA/QC – Excalibur Casino – Las Vegas NV
Inspection/ QA/QC – City Center Employees Parking Garage – Las Vegas NV

Company: W.E. O’Neil Const
Independent 3rd Party Inspection/Coating Failure Analysis – Sunrise Senior Living Gilbert AZ

Company: Zimmerman Investments
Independent 3rd Party Inspection/ QA/QC – Freeport Logistics Building – Phoenix AZ
Independent 3rd Party Inspection/Coating Failure Analysis – 955 Fiesta Blvd – Gilbert, AZ
Independent 3rd Party Inspection / QA/QC – 1171 & 1191 Fiesta Blvd Buildings – Gilbert, AZ

Company: 180 Degrees Commerical Inc
Independent 3rd Party Inspection/ Adhesion Testing – 2201 N. Central Building – Phoenix AZ

Rail Road Cars

Gunderson – GIMSA
Independent 3rd Party Inspection / Consultant – Surface Preparation of Railroad Hopper and Tank Cars – Monclova – Mexico

Power Plants

Company: Commonwealth Dynamics Inc. 2009
Independent 3rd Party Inspection / Consultant – Surface Preparation and Re-coating Chimney Unit #1 – Ghent Power Plant – Ghent Kentucky

Company: Commonwealth Dynamics Inc. 2010
Independent 3rd Party Inspection / Consultant – Surface Preparation and Re-coating Chimney Unit #1 & #4 – Ghent Power Plant – Ghent Kentucky
Independent 3rd Party Inspection / Consultant – Surface Preparation and Re-coating Chimney – Brown Station – Harrodsburg, Kentucky

Company: Laron Inc.
Independent 3rd Party Inspection / Consultant – Pipe DFT Readings & Holiday Testing Mesquite Plant